New build defects after you move in: how to get them fixed

Report every defect in writing within the two-year builder warranty period, give the developer 30 days, then use the formal complaints process. If that fails, the Ombudsman, the Consumer Code scheme or your warranty provider can step in.

By ARX Algorithms, makers of SnagAudit · Updated 26 October 2026

The short answer

For the first two years after legal completion, the developer is responsible for putting right defects in your new home. Report each one in writing, with photographs, as soon as you find it and always before the two-year period ends. Under the New Homes Quality Code a developer should settle an after-sales issue within 30 days unless there is a significant reason for delay. If it does not, make a formal complaint. If the complaint is still unresolved after 56 days, you can take it to the New Homes Ombudsman Service, or to the Consumer Code for Home Builders dispute scheme if your developer follows that code instead. Separately, the warranty provider (NHBC, LABC Warranty, Premier Guarantee and others) can help if the developer fails to act, and insures the structure from year 3 to year 10.

Use our free new build defect deadlines calculator to work out each date from your own completion and complaint dates.

Which rules apply to your home

Three layers of protection usually sit on top of each other:

LayerWhat it doesHow you know you have it
Structural warranty (NHBC Buildmark, LABC Warranty, Premier Guarantee and others)Years 1 and 2: the developer must fix defects, and the provider can step in if it does not. Years 3 to 10: insurance for damage from defects in specified parts of the home.A warranty certificate from your conveyancer at completion. Almost every mortgage lender requires one.
New Homes Quality Code (NHQB)Sets how a registered developer must handle snags and complaints, with fixed letter deadlines, and gives you the New Homes Ombudsman Service.Your reservation agreement says the developer is registered.
Consumer Code for Home BuildersOlder code still used by many builders. Gives you an independent dispute resolution scheme run by CEDR.Your reservation paperwork refers to it.

Step 1: report each defect in writing, early

NHBC's guidance is to contact the builder "as soon as you reasonably can (but always within the builder warranty period)", and to keep a record of what you said, who you wrote to or spoke to, and when. Phone calls are easy to forget and hard to prove. An email or letter with a numbered list of defects and photographs is not.

A defect report the developer cannot argue with has, for each item:

  1. A number, so everyone refers to the same thing.
  2. The exact location: room, wall, height. "Bedroom 2, window wall, left of the window, about 1.2 m up."
  3. What you can see, not what you think caused it. "Crack in the plaster, about 2.5 mm wide and 600 mm long, running diagonally from the window corner."
  4. A measurement against the standard where one applies. NHBC Standards chapter 9.1 sets tolerances for walls, floors, doors, tiling and more; our new build snagging checklist lists the common ones.
  5. Dated photographs, one close-up and one wide shot that shows where it is, with a tape measure or straight edge in shot where size matters.
  6. The date you reported it and who to.

Report everything in one list, then add to it as you find more. Developers often schedule trades by type, so naming the trade (plasterer, plumber, joiner) can speed things up.

Step 2: give the developer a fair chance to fix it

The New Homes Quality Code says a developer must "settle an after-sales issue or problem within 30 days, unless there is a significant reason for a delay", and if there is a delay must update you at least once a month until it is settled. The Code's glossary says that if a snag is not fixed within 30 days of being reported, you can use the formal complaints process.

You must give reasonable access for the work. If a repair is done badly, add it back to your list with new photographs rather than starting a fresh thread, so the history stays together.

Step 3: make a formal complaint

If the issue is not fixed, write to the developer and say clearly that you are making a formal complaint. For a developer registered under the New Homes Quality Code (version 2, March 2026), section 3.4 sets these deadlines from the complaint start date:

LetterDeadline
AcknowledgementNo later than 5 days from the first business day after receiving the complaint
Path to Resolution letterNo later than 10 days
Complaint Assessment and Response letterNo later than 30 days, then updates at least every 28 days if work is still needed
Eight-Week letter (if still open)No later than 56 days

Under the Code, you can raise complaints for two years from reservation or completion, whichever is later.

Step 4: escalate

New Homes Ombudsman Service

If your developer is registered under the New Homes Quality Code and the complaint is not resolved, you can refer it to the New Homes Ombudsman Service after 56 days from the complaint start date. The Code says to refer "as soon as possible". Developers' own published procedures, such as Barratt's, add that referral must be made no later than 12 months after the developer's final response, and that it applies to homes reserved on or after 1 November 2022. The Ombudsman decides whether and when to accept a complaint.

Consumer Code for Home Builders scheme

If your builder follows the Consumer Code instead, you can apply to the independent dispute resolution scheme, run by CEDR, once your complaint has not been resolved within 56 calendar days, and no later than 12 months after the builder's final response. The complaint must arise within the first two years of the warranty cover. CEDR says awards can be up to £15,000 including VAT for homes reserved before 1 January 2024, and up to £50,000 for homes reserved after that date under the fifth edition of the Code. The scheme looks at whether the builder broke the Code, for example how it dealt with reported snags, rather than re-doing the builder's technical assessment of a defect.

Your warranty provider

NHBC's resolution service can help if the builder fails to meet its obligations during the first two years. Before asking, you must have told the builder within the warranty period, allowed reasonable time and access, and completed the builder's complaints process, including receiving a final written response within 30 days of a formal complaint (or no response in that time). LABC Warranty says to contact it during the same period if the developer will not resolve an issue, with the problems documented.

After year two: structural cover and the law

From year 3 to year 10 the developer is generally no longer responsible under the warranty. The provider insures damage caused by defects in specified parts of the home. LABC Warranty lists foundations, load-bearing walls, floors, roofs, chimneys, external finishes and external glazing, excludes wear and tear, cosmetic issues and snagging, and sets a minimum excess of £1,000. NHBC applies a minimum claim value shown on your certificate. Check your own policy.

Outside the warranty, section 1 of the Defective Premises Act 1972 requires anyone who builds a dwelling to do the work in a workmanlike or professional manner, with proper materials, so that it is fit for habitation. Since 28 June 2022 the time limit for that claim is 15 years from completion, or 30 years for homes completed earlier (Building Safety Act 2022, section 135). These are legal claims: take advice from a solicitor before relying on them.

What to keep

Doing it on a phone

SnagAudit is built for exactly this record. Each snag gets a number, a location, a category, the responsible trade, a "measured against tolerance" note and marked-up photographs, stored inside the app with a timestamp and a hash taken at capture so they can be shown to be unaltered. Export a numbered PDF to send with your report. When the developer says it is fixed, start a re-inspection: open snags carry forward with their original photographs, so the follow-up report shows before and after.

Sources

Questions

How long does a developer have to fix snags after I move in?

The New Homes Quality Code expects a registered developer to settle an after-sales issue within 30 days unless there is a significant reason for delay, with monthly updates until it is done. The developer remains responsible for defects you report during the two-year builder warranty period.

What if the developer ignores my complaint?

Under the New Homes Quality Code you can refer an unresolved complaint to the New Homes Ombudsman Service after 56 days. If your builder follows the Consumer Code for Home Builders, you can apply to its dispute scheme after 56 days. Your warranty provider may also help once you have been through the builder's complaints process.

Is there a deadline for going to the New Homes Ombudsman?

Refer as soon as possible. Developers' published procedures say referral must be no later than 12 months after the developer's final response.

Can I still claim after the two-year warranty period?

From years 3 to 10 the warranty provider insures damage from defects in specified parts of the home, usually the structure, subject to a minimum claim value or excess. A claim under the Defective Premises Act can be possible for 15 years from completion; take legal advice.

Are hairline cracks a defect?

Small shrinkage cracks are expected as a new home dries out and are usually treated as normal maintenance. See our guide to cracks in new build walls for the widths that are worth reporting.